Having built a relationship with GPE and D&B contractor Interaction whilst working on The Hickman building, we were appointed to provide Project Management and Employer’s Agent services for the fit-out of three floors out of the four-storey of the 54 Woolyard building.

This new addition to GPE’s fitted and fully managed office space was designed to compliment the existing fabric of the building.

Designed to provide 3 separate occupier’s space, each floor has been created to include kitchen and breakout areas and upgrade existing terraces.

A strong emphasis was put on the re-use and repurposing of materials on site with the refurbishment of the existing AC system and the re-instatement of existing lighting. Redundant joinery features were also dismantled on site and reused as features throughout the space. Additions also included the use of reclaimed furniture and accessories.

A new app-based access control system has been introduced to enable contactless entry via the Sesame app.

Client
Great Portland Estates

Building/Street Name
54 Woolyard, Bermondsey Street, London

Construction Period
13 weeks

Project Value
<£2m

Accreditations
Awarded with SKA ‘Gold’

Area of Advice
Project Management