| Having built a relationship with GPE and D&B contractor Interaction whilst working on The Hickman building, we were appointed to provide Project Management and Employer’s Agent services for the fit-out of three floors out of the four-storey of the 54 Woolyard building. This new addition to GPE’s fitted and fully managed office space was designed to compliment the existing fabric of the building. Designed to provide 3 separate occupier’s space, each floor has been created to include kitchen and breakout areas and upgrade existing terraces. A strong emphasis was put on the re-use and repurposing of materials on site with the refurbishment of the existing AC system and the re-instatement of existing lighting. Redundant joinery features were also dismantled on site and reused as features throughout the space. Additions also included the use of reclaimed furniture and accessories. A new app-based access control system has been introduced to enable contactless entry via the Sesame app. |
Client
Great Portland Estates
Building/Street Name
54 Woolyard, Bermondsey Street, London
Construction Period
13 weeks
Project Value
<£2m
Accreditations
Awarded with SKA ‘Gold’
Area of Advice
Project Management
Occupier 360







